Algar Developments Inc and Buildcrest developed BT Modern Towns, a completed community of 24 townhomes at 12 Dervock Crescent in Toronto’s Bayview Village. Completed in 2022, the 3-storey project has homes from 839 to 1,585 sq ft priced from $1,079,900 to $1,599,900.
BT Modern Towns pricing and floor plans
Homes are currently priced from $1,079,900 to $1,599,900, with pricing at $1,127 per square foot. The project’s 26 floor plan layouts are all two-bedroom designs, measuring 839 to 1,585 square feet.
Maintenance fees run $0.26 per square foot, and a storage locker is priced at $3,500.
Location
12 Dervock Crescent is in the Bayview Village neighbourhood of Toronto. The project rises 10.6 metres, and the location records a Walk Score of 70 alongside a Transit Score of 71.
Amenities and features
- Rooftop terrace
- Parking available
- Storage lockers available
Deposit structure and incentives
The deposit structure is 10% over 90 days plus 5% at occupancy: $5,000 on signing, the balance to 5% in 30 days, another 5% at 90 days and a final 5% at occupancy.
The development team
Algar Developments Inc and Buildcrest are the developers of BT Modern Towns.
Buying at BT Modern Towns
Registering with Meta Realty unlocks platinum access to the floor plans, current pricing and incentives at BT Modern Towns. Resale homes are also available in the community, and our team can help you explore them.
Prices, sizes, availability and incentives are subject to change without notice. E. & O.E.
BT Modern Towns at a glance
| Sales status | Public Sales (resale units also available) |
|---|---|
| Construction | Complete |
| Building type | Townhouse |
| Storeys | 3 |
| Height | 11 m |
| Estimated occupancy | 2022 |
| Launch | 2019-07-31 |
| Neighbourhood | Bayview Village, Toronto |
| Maintenance | $0.26/sq ft |
| Walk Score | 70/100 |
| Transit Score | 71/100 |
Features & finishes
- OVERVIEW
- 1) European style contemporary kitchens with stainless steel and integrated appliances
- 2) Ceiling height approx. 9’6” (Principal Rooms)
- 3) Concrete ceilings as per plan
- 4) Interior walls and trim painted with flat white latex paint
- 5) Baseboards are square edge in paint-grade finish
- 6) Contemporary staircase
- 7) Individual, digitally-controlled HVAC systems as per plan
- 8) Acoustically engineered demising party walls
- 9) Front load washer/dryer
- 10) All terraces have outdoor lighting
- 11) Rooftop terraces have concrete pavers
- 12) Gas line to roof top terraces and garden terraces
- 13) Gas fire pit for roof top terraces only
- 14) Hose bib connections to terraces
- KITCHEN
- 1) Contemporary, custom designed European-style kitchen cabinetry
- 2) Quartz counter tops as per builders samples
- 3) Stainless steel undermount kitchen sink as per plan
- 4) Black single lever deck mounted kitchen faucet
- 5) Designer selected tile backsplash as per builder’s samples
- 6) Quartz countertop islands (Optional as per plan)
- 7) Integrated stainless steel fridge, Integrated panel ready dishwasher, electric slide in stove, built-in stainless steel microwave and a built-in hood fan
- 8) Surface mounted under cabinet lighting
- ELECTRICAL FIXTURES
- 1) Designer selected lighting package as per plan
- 2) Lighting in kitchen as per plan
- 3) Pot lights as per plan
- 4) Contemporary white receptacles and switches throughout
- 5) Capped ceiling light fixture outlet in living/dining room and bedrooms as per plan
Frequently asked questions
Where is BT Modern Towns?
You can find BT Modern Towns at 12 Dervock Crescent in Bayview Village, Toronto.
How much do BT Modern Towns homes cost?
Current prices run from $1,079,900 to $1,599,900; the project's price per square foot is $1,127.
How many bedrooms do the homes have?
All 26 floor plan layouts are two-bedroom designs, from 839 to 1,585 sq ft.
What is the deposit at BT Modern Towns?
It is 10% over 90 days plus 5% at occupancy, starting with $5,000 on signing.
How much is a locker?
A storage locker is priced at $3,500.
Who developed BT Modern Towns?
Algar Developments Inc and Buildcrest developed the community, which was completed in 2022.


















































